DVD Profilers

Project 3 Checklist

JoreyL's picture

Here is my Checklist

Final Project Documentation and Multimedia Presentation

mscheidt's picture

Attached to this post is a PDF document with the user documentaiton.  The multimedia presentation is available at:

http://web.ics.purdue.edu/~mscheidt/Creating%20a%20Facebook%20Group.htm

The presentation contains audio. 

DVD Profilers Final Multimedia Presentation

nateth3gr8's picture

Here is the link to the multimedia presention.  The files are in a folder, which is then zipped. The entire folder needs to be unzipped to ensure that the PowerPoint displays correctly.  Thank you for everyone that contributed and gave feedback. 

 

http://d99640c4.fb.joyent.us/DVD_Profiler_Presentation.zip

 

DVD Profilers

DVD Profilers Fianl User Documentation

JoreyL's picture

Here is our User Documention.  Thank you to every one who helped by providing feedback on it.

 

 

Thanks,

 

DVD Profilers

Week 16 Log

JoreyL's picture

This week was a really productive week for our group.  After we had split up our tasks to each person, this week saw the task of combining each on of those steps together to form one seamless project.  Which was very challenging since half of group has the ability of meeting face to face and the other have only get to communicate with emails.  This weeks main task was to create the drafts for our User Documentation and the Media presentation.  Our group has decided to combine both the use of a power poing presentation and videos of importants steps.  The creation of the videos was a challenge in making them so that the client could play them with out having to load any extra software to view them as they first were made.  But once that was conquered they looked really good and the audio really helps get through the video.  With the feedback we have gathered on the separate tasks it shouldn't be to hard to finish creating a top notch presentation that the client will love.

Week 16 Project Log

This week went pretty well. Our group made a lot of progress. We encountered a few big problems. First, our idea to have audio and video made it very difficult to upload a PowerPoint with these included onto the website. I edited the User Documentation that Jorey compiled. I was really busy throughout the week but the group got everything done effectively. The Usability Study vs Usability Test issue certainly cost some time but Tyler took care of that. Overall, I'm pretty confident with the work that was done and I think we can certainly convince Shreve and IT to install DVD Profiler.

Project Log Week 16

nateth3gr8's picture

This week was very stressful.  While we devided up the tasks for the final deliverables up, they all had to be put back together.  Last week, I recorded the screen captures and then sent them to another group member to add audio.  This week, my job was to make a presentation with the videos with audio included.  While this seems like it would be simple, uploading a PowerPoint with linked videos to the website is near impossible.  This may be why a different technology, like Adobe Captivate may have been a better choice.  But as this is what we have planned on, we will continue with this as our final project submission.

Week 16 Project Log

This week has been very productive for the DVD Profilers
group.  We had a meeting on Tuesday
evening regarding the next steps of the projects.  I wasn’t able to stay around very long though
because I had something else come up.  The
usability report was not the correct form that was desired.  I corrected the usability report and updated
it on the existing blog with the previous usability report.  The user documentation and multimedia
presentation drafts were submitted. 
These drafts looked very strong in my opinion, but may still need some
revisions after the comments are posted.  We are well on our way to completing project
three.

Project log week 16 4-25-2008

The project is wrapping up nicely.  All we have yet to do is compile everything together.  Everyone took a small part of teh project and it made it go very smoothly.  The project turnned out very good and our group managed to work pretty well together.  A couple people missed meetings but it was not a reoccuring problem at least so not a huge issue.

Syndicate content