jrlawren's blog

Project log week 16 4-25-2008

The project is wrapping up nicely.  All we have yet to do is compile everything together.  Everyone took a small part of teh project and it made it go very smoothly.  The project turnned out very good and our group managed to work pretty well together.  A couple people missed meetings but it was not a reoccuring problem at least so not a huge issue.

Project Log 4-18

This week went well. We mostly worked individually this week and just met on sunday to discuess what each of us would do and on thursday we discuessed what we did to make sure everyone was still on task. Everyone is now doing an even share of teh work now that we have parts that can easily be split up.  So far everything looks good and is progressing smoothly.

Usability Study Individual

Here is my usability study.  No comments on last weeks draft so it is identical to last weeks.

Week 14 project log

This week went good.  So far only 2 members of teh group have done a lot of teh work but it makes sense why they did, teh work should be more evenly distributed once we get into making the presentation.  So far we have not had any trouble meeting together and have accomplished everything necessard in a timly manner.  I would say that so far we are progressing nicely.

DVD Profiler Usability Test 4-7

Here is my usability test for DVD Profiler

Project log

This week was overall productive.  We met on Wednesday to discuess a topic and to get it approved.  We ended up comming up with a DVD database program to propose to Shreve Hall.  We were able to get an e-mail written and tehn proof read by all but one member of the group.  So far it looks like we are on track and we have our next meeting planned on sunday evening.

Project Log week 12

Week 12 is done and so is teh project now.  All we had to do this week was go through Kevin's comments and make some changes to our instructions.  Most of teh changes were formatting such as spacing and changing teh font, using inallics, bold, and underlined fonts.  Before now our project was debateably hard to read now after a little work we made it more easily read.  My partner and I were able to take care of all of this in just about a half hour of talking on aim and in teh chat room.  This week went well.

Froject 2 Final

Here is our final draft of our illustraited instructions.

 

Link to previous draft and usability test.

http://www.digitalparlor.org/sp08/mckelvey3/node/1465 

To Finish Project

Near as I can tell we are done with our project.  Because it is not due until Wednesday we will probably read through it one last time for spelling and grammer. 

Project Log Week 11

This week went well.  We were able to get the the useability test and draft cleaned up and made comments on another groups draft and usability test. Our draft looks like it is fairly easy to understand and follow.  This week we mainly focused on the formatting.  Making consistent spaceing between lines and split up some of our steps into smaller steps with section headings.  So far the project is moving along fine.

Syndicate content