jeseger's blog

Week 16 Blog

jeseger's picture

This was a very productive week as well for Team Google. It was my job this week to complete the user documentation draft for the project. To do this, I altered the draft from its original state so that it would be catered to the needs of the Wildcat Creek Foundation.

On Thursday, April 24, Team Google met in order to compile all of the individual drafts for the user documentation and multimedia presentation. Altogether, this took nearly one hour. Since everyone had all of their work done, it was very easy to compile all of the drafts into one.

We will be meeting next Monday, April 28 in order to complete Project 3.

User Documentation for Team Google

jeseger's picture

Attached to this blog is the user documentation for Team Google. 

Do you think this is professional?  Were you able to follow the instructions yourself?  Any other feedback?

 We would appreciate any feedback that you can give.

Week 15 Project Log

jeseger's picture
This week was a very productive week for Team Google. All throughout the week, the whole team worked on their individual usability study. Then on Thursday, April 17, Team Google met to discuss their individual usability studies. After discussing what we thought needed to be in the team usability study, we compiled all of our usability studies into one, final and authoritative usability report. In addition to compiling our team usability report, we also discussed what we needed to do to begin work on the user documentation and multimedia presentation. I (Jon) was put in charge of revising the user documentation. Chris was put in charge of taking some screenshots with Adobe Captivate. Dan was put in charge of coming up with an overall outline of the presentation. Zach is in charge of part of the presentation, and Dayne is in charge of getting some of the content ready for the presentation.

Team Google Usability Report

jeseger's picture
Attached is the final usability report for Team Google. If you have any comments or replies, please reply to this blog. Thanks for your input.

Final Individual Usability Test

jeseger's picture

Usability Test –Implementing Google Maps on a Website

 

Week 14 Project Log

jeseger's picture

During week 14, Team Google accomplished many different aspects of Project 3.  On Monday, I was assigned the task of writing up a proposal for Project 3.  This task was not very difficult since we as a team already had in mind exactly what we were to do for the project.  In addition to submitting the proposal draft on Monday, Team Google met on Thursday to discuss the rest of the project.  During the meeting, we revised our proposal and submitted the final revision.  We also talked about what was coming up and how we were to combat it.  We decided that over the weekend, Dayne was to come up with a slide template for the presentation, Chris was to alter the Google Maps instructions to cater to the needs of the Wildcat Creek Foundation, and everyone was to work on their individual usability reports.

For next week, Team Google will be meeting on Thursday to finalize the usability report and to begin work on the multimedia presentation.

Proposal Draft

jeseger's picture
Attached to this blog is the draft of Team Google's proposal. Any advice that you can give will be much appreciated.

Individual Usability Test Draft

jeseger's picture
Attached to this blog is my Individual Usability Test Draft. I would appreciate any feedback that you can give. This usability test is for instructions on setting up Google Maps on a website that uses Dreamweaver.

Week 13 Project Log

jeseger's picture

Overall, this week went very well as it pertains to beginning Project 3. On Monday, we were put into groups. The people my Project 3 group are myself, Zach Miller, Dayne Tyner, Chris Snodgrass, and Daniel Kuntz. After being put into our group, I sent out an email introducing myself to the other members that expained what we needed to do next for the project. It was through a series of responses that we decided to set up a chat with Kevin on Tuesday at 5:30pm. It was during this chat that we decided what we were going to do for the project and what our team name would be.

Project 2: Final Revision

jeseger's picture
This blog contains the final revision of the Illustrated Instructions project for Team Yatta.  Members of Team Yatta include Zach Miller and Jon Seger.  The goal of the Illustrated Instructions is to describe how to create a simple cup using the CAD program Pro-Engineer. Attached to this blog, you will find the final revision of the Illustrated Instructions as well as the revisions that were made upon receiving the Usability Test results. In order to see what was included in the Usability Test, you can follow the link below. In order to see the initial Project 2 Proposal, you can go the website as seen below.

Usability Test: http://www.digitalparlor.org/sp08/mckelvey3/node/1443

Proposal: http://www.digitalparlor.org/sp08/mckelvey3/node/1232

It is the hope of Team Yatta that these instructions will one day aid a student in learning more about Pro-Engineer.